Planning resources

NAS® can calculate the time required for the document execution. All activities needed for document execution are identified, and the time needed for their execution is determined for each. The final result is the occupancy of each individual resource type.

The system leads the average times required to complete each activity, which might depend on the material and route. Since the system measures the duration of each individual operation phase, the data acquired can be used to estimate and repair the pre-defined times needed for activity execution. At the same time, the deviations can be measured, which might show the need for additional activity partitioning.

goin up